Previous
Category
Factory
Country or Area
Project name: KS-2 Tangenvika Railway Bridge, Norway
Contractor: Implenia AG; kellergeoteknikk
Location: Oslo, Norway
Background:
Norwegian authorities are improving rail connections between Oslo and other cities by means of the Intercity Project. One of the elements of the so-called Intercity Project is the development of double tracks for high-speed trains on the Oslo-Lillehammer line. This together with a substantial reduction in the length of track. This reduction requires a 3 km long tunnel and the longest railway bridge in the country. Near the village of Espa on the banks of lake Mjøsa, one of the largest lakes in Norway, the project plans a kilometre-long bridge across the bay at the peninsula of Tangenvika.
First driven pile installed on Tangenvika Project! And what a pile it is… 85m long, 1,430mm diameter with a net weight of 102t… lifted and installed in one piece! The work at Tangenvika Project despite the outside temperature reaching -28°C.
Delivery time: April, 2023
Products: OD 1016mm x WT 28mm; OD 1016mm x WT 40mm; OD 1430mm x WT 34mm; S355J2H EN 10219 8300 tons